Bradley Elementary, Conroe, TX

New Construction

This project features an advanced Building Automation System (BAS) designed to deliver high-efficiency performance, reliability, and intuitive control for a new elementary school’s HVAC infrastructure.

Project Highlights
Central Plant Controls

Installed a bypassed-loop chilled water system to ensure consistent performance and energy efficiency, including:

  • (2) High-efficiency Chillers
  • (2) Cooling Towers
  • Primary and Secondary Chilled Water Pumps
  • Condenser Water Pumps
Web-Based BAS Interface
  • Fully integrated graphical user interface for real-time monitoring and control
  • Secure, remote access for Central Plant Managers through a web-based platform
  • Streamlined system navigation for quick diagnostics, performance optimization, and system adjustments from any location
Results

The BAS solution provides the school with long-term operational savings, simplified facility management, and enhanced comfort for students and staff—all supported by secure, scalable IoT technology.

MEP Engineer:DBR