New Construction


This project features an advanced Building Automation System (BAS) designed to deliver high-efficiency performance, reliability, and intuitive control for a new elementary school’s HVAC infrastructure.
Project Highlights
Central Plant Controls
Installed a bypassed-loop chilled water system to ensure consistent performance and energy efficiency, including:
- (2) High-efficiency Chillers
- (2) Cooling Towers
- Primary and Secondary Chilled Water Pumps
- Condenser Water Pumps
Web-Based BAS Interface
- Fully integrated graphical user interface for real-time monitoring and control
- Secure, remote access for Central Plant Managers through a web-based platform
- Streamlined system navigation for quick diagnostics, performance optimization, and system adjustments from any location
Results
The BAS solution provides the school with long-term operational savings, simplified facility management, and enhanced comfort for students and staff—all supported by secure, scalable IoT technology.