New Construction
Located at Beltway 8 and Interstate 45, this 1-million-square-foot Coca-Cola manufacturing facility opened in 2020 with five state-of-the-art production lines.
Project Highlights
The Hunton Group team—Kevin Murphy, Scott Jaehne, Adam Castillo, and Kurt McCulloch—played a key role in delivering a high-efficiency HVAC and controls system, including:
- 21 Packaged Rooftop Units for facility-wide climate control
- 24 Central Station Air Handling Units (CSAA’s) for large-scale air distribution
- 3 Mini-Split Systems for targeted cooling needs
- 54 Variable Air Volume (VAV) Systems to enhance energy efficiency
- 35 Fan-Powered Thermal Units for precise temperature management
- 168 Variable Frequency Drives (VFDs) and Controls for optimized airflow and equipment performance
This facility is a showcase of advanced HVAC technology, ensuring operational efficiency, energy savings, and climate precision for one of the largest Coca-Cola manufacturing plants in the region.
Book a Tour of an IoT project here.