New Construction
Convergentz proudly supported the development of a new government processing center in Conroe, TX, providing a fully customized Building Automation System (BAS) to ensure secure, efficient, and reliable building operations.
This 392,625-square-foot facility is designed to house up to 3,000 occupants and required a sophisticated controls solution to match its scale and complexity. Our team worked closely with stakeholders to design, program, and install a system tailored to the center’s unique operational needs.
Project Highlights
Customized BAS Programming and Installation
The system was engineered to align with the specific operational and security requirements of the facility.
Supervisory Control via Trane Tracer Technology
Installed three Trane Tracer supervisory controllers to manage and monitor a wide range of HVAC and safety systems.
Comprehensive Equipment Integration
- 2 Air-Cooled Trane Chillers
- 21 Trane Air Handling Units (AHUs)
- 20 Fan Coil Units (FCUs)
- 145 Variable Air Volume (VAV) Boxes
- Integrated Smoke Control System for enhanced life safety